Installation of an Additional Borehole
As the number of students increased, demand for clean water also increased. To solve the problem, a second water borehole was drilled. An electrical submissive pump with an overhead water tank was installed. The supply of water was improved by laying pipes to provide running water to the school, clinic and the local community.